Latest News
BASEC suspend licence of Turkish manufacturer
Atlas Kablo Sanayi Ticaret Anonim Sirketi of Turkey has violated their BASEC product certification licence which has now been suspended by BASEC with immediate effect and until further notice. They are better known in the UK as Atlas Kablo who supply a number of cable distributors and wholesalers with PVC house wiring, flex and conduit wires.
Excess Stock
We currently have a number of items that we do not consider part of our ideal inventory. Please see our "Excess Store" link to view the items and feel free too seek.
Approved cables initiative revealed to electrical supply industry
Today, the Approved Cables Initiative (ACI) launched its proactive and co-ordinated plan to investigate and address the issue of unsafe, non-approved and counterfeit cables in the UK marketplace.
Excess Stock
We currently have a number of items that we do not consider part of our ideal inventory. Please see our "Excess Store" link to view the items and feel free too seek.
BS 5308 SPECIFICATION WITHDRAWN
The British Standards Institute (BSI) has withdrawn the standard for instrumentation cable BS 5308:1986 Instrumentation cables parts 1 and 2.
BASEC issues warning notice
BASEC has issued a public warning notice about certain cables which have been sold into the UK market.
TRATOS Armaflex
Instrumentation, Power and Composite Interlocked Armoured Cables
Tratos produce 18km continuous lenght of subsea fibre
18th May 2009
TRATOS recently supplied a 24 Optical Fibres cable suitable for subsea installation up to 200 meters in depth for the ADRIATIC LNG Terminal which required a continuous length of 18km.
The Adriatic LNG terminal is a liquid natural gas offshore terminal nine miles offshore near Rovigo, Italy in the northern Adriatic. It is the world's first offshore LNG terminal. When the terminal becomes fully operational, it is expected to store and regasify 21.8 million cubic meters (770 million cubic feet) per day, enough to meet 10% of Italy’s natural gas needs.
The continual 18km length of Fibre in the TRATOS Cavi factory in Pieve S. Stefano (Italy)
The Adriatic LNG terminal on its way from Algeciras, Spain to it final destination near Rovigo, Italy in the northern Adriatic.

